The following photo
essay shows the behind the scenes work of how the
Tibs team provided the backup power for the G8
Summit
|
 |
Vault arrives at T&D
Manufacturing for generator installation. |
|
 |
Inside the
bulletproof vault. |
|
 |
Completed Vault
travels more than 300 miles from Atlanta to Sea
Island. |
|
 |
Vault arrives at Sea
Island. |
|
 |
Vault off loaded at
one of the major G8 Venues. |
|
 |
Vault being put in
place by Tibs' team. |
|
 |
Vault installed at
Beach Club. |
|
 |
GenSet installed at
Canon House. |
###